SR. NO CLINT/PMC/TPI NAME PROJECT NAME DURATION (FROM-TO) DESCRIPTION
1 M/s Gail Gas Limited Gail Bharatpur CNG Pipe line PCP Work Aug 2019 Nov 2019 PCP Work Gail Bharatpur CNG Pipeline 12.500km
2 Torrent Mega Power plant Surat Torrent Surat Hospital fire line PCP Project Aug 2019 Dec 2019 Fire Line PCP Work
3 M/S. Aspen Infrastructures Limited Waghodiya Baroda Aspen GAS PIPELINE PROJECT TCP & PCP CATHODIC PROTECTION SYSTEM & PAINTING SERVICE 11.09.2018 - 10.10.2018 TLP 01, mg Anode 7.8 kg ,04 no’s Pinbrezing 10,25 sq mm cable 40mtr, Shunt Resister Surge Drivetor Pipeline Paint Service .
4 M/S. Aspen Infrastructures Limited Waghodiya Baroda Aspen GAS PIPELINE PROJECT TCP & PCP CATHODIC PROTECTION SYSTEM & PAINTING MATERIAL SUPPLY 11.09.2018 10.10.2018 TLP 01, mg Anode 7.8 kg ,04 no’s Pinbrezing 10,25 sq mm cable 40mtr, Shunt Resister Surge Drivetor Pipeline Paint Supply.
5 M/s TORRENT POWER LIMITED Torrent Power Water lin 10.500 Km / Gas pipe line project Dahej 13.500 km 18’’ PCP Service 24.07.2018 - 30.06.2019 TLP 04,KRIK CELL 02 nos, Zinc 20kg 04 nos ,Pinbrezing 10 Nos,25 sq mm cable 100mtr,04 sq. mm cable 100mtr with HDPE pipe 50 Mtr. Service
6 M/s GITL (GSPL Group ) KALPATARU POWER TRANSMISSION LIMITED Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL 23.07.2018 - 30.12.2019 1060 Nos Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For 305 KM Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL
7 M/s GITL (GSPL Group) C/O- M/s KALPATARU POWER TRANSMISSION LIMITED Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer -In -Charge For Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL 23.07.2018 - 30.12.2019 265 No's Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer -In - Charge For 305 KM Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL
8 M/s. CAIRN ENERGY LIMITED C/O.M/s SOPAN O&M COMPANY PVT.LTD Work order for PIN BRAZING JOB at Cairn - Badmer site 06.11.2017-05.12.2017 20 Nos PIN BRAZING SUPPLY & INSTALLASTION
9 M/s GAIL (INDIA ) LIMITED C/O -M/s KALPATARU POWER TRANSMISSION LIMITED Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For 157 KM Auraiya-Phulpur Project for M/s GAIL 02.09.2017 - 15.08.2018 120 no’s Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer- In -Charge For Auraiya-Phulpur Project for M/s GAIL
10 M/s HINDUSTAN PETROLEUM CORPORATION LIMITED SUPPLY & INSTALLASTION JETTY PIPELINE 24” 11.500 KM MUNDRA PORT TO - ADANI PORT 3 No's Pipeline 06.06.2017 - 30.06.2017 TLP 04 NOS, Zinc 20kg 04 NOS, Pinbrezing 16 NOS ,25 sq. mm cable 200 mtr,04 sq. mm cable 200 mtr, Permanent Ref. Cell 04 No’s ,Surge Drivetor 02 No’s SUPPLY & INSTALLASTION
11 M/s GAIL (INDIA ) LIMITED C/O. M/s KALPATARU POWER TRANSMISSION LIMITED Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For 157 KM Auraiya-Phulpur Project for M/s GAIL 05.06.2017 - 30.08.2017 120 no's Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For Auraiya-Phulpur Project for M/s GAIL
12 M/s Indian Oil Corporation Limited.C/O – M/s Essar Project (INDIA)Limited KV -Replacement Pipeline Project ( Koyali Refinryiping ) 11.01.2017 - 30.06.2017 KVPL Koyali plant piping 18"dia mainline laying work 0.500 km APPROX (COMPOSITE 2 MAINLINE)
13 M/s Indian Oil Corporation Limited. C/O – M/s Essar Project (INDIA)Limited Purchase order for Supply of C.P. Mold 6 SQ MM & 25 SQ MM Used for Auraya - Phulpur Pipeline project of M/s GAIL 05.06.2017 - 30.07.2017 Supply of C.P. Mold 6 SQ MM & 25 SQ MM Used for Auraya - ur Pipeline project of M/s GAIL
14 M/s TORRENT POWER LIMITED Torrent Power Gas pipeline Project Dahej 13.500 km 18’’ Installation & commissioning ER Probe 25.12.2016 - 30.03.2017 Installation & commissioning ER Probe
15 M/s TORRENT POWER LIMITED Torrent Power Gas pipeline Project Dahej 13.500 km 18’’ PCP Material service 10.08.2016 - 30.01.2017 TLP 03,KRIK CELL 03,Zinc 20kg 03,pinbrezing 12,25 sq mm cable 200mtr,04 sq mm cable 200mtr with HDPE pipe 50 mtr Service
16 M/s TORRENT POWER LIMITED Torrent Power Gas pipeline Project Dahej 13.500 km 18’’ PCP Material supply 10.08.2016 to 30.01.2017 TLP 03,KRIK CELL 03,Zinc 20kg 03,pinbrezing 12,25 sq mm cable 200mtr,04 sq mm cable 200mtr with HDPE pipe 50 mtr Supply