| SR. NO | CLINT/PMC/TPI NAME | PROJECT NAME | DURATION (FROM-TO) | DESCRIPTION |
|---|---|---|---|---|
| 1 | M/s Gail Gas Limited | Gail Bharatpur CNG Pipe line PCP Work | Aug 2019 Nov 2019 | PCP Work Gail Bharatpur CNG Pipeline 12.500km |
| 2 | Torrent Mega Power plant Surat | Torrent Surat Hospital fire line PCP Project | Aug 2019 Dec 2019 | Fire Line PCP Work |
| 3 | M/S. Aspen Infrastructures Limited Waghodiya Baroda | Aspen GAS PIPELINE PROJECT TCP & PCP CATHODIC PROTECTION SYSTEM & PAINTING SERVICE | 11.09.2018 - 10.10.2018 | TLP 01, mg Anode 7.8 kg ,04 no’s Pinbrezing 10,25 sq mm cable 40mtr, Shunt Resister Surge Drivetor Pipeline Paint Service . |
| 4 | M/S. Aspen Infrastructures Limited Waghodiya Baroda | Aspen GAS PIPELINE PROJECT TCP & PCP CATHODIC PROTECTION SYSTEM & PAINTING MATERIAL SUPPLY | 11.09.2018 10.10.2018 | TLP 01, mg Anode 7.8 kg ,04 no’s Pinbrezing 10,25 sq mm cable 40mtr, Shunt Resister Surge Drivetor Pipeline Paint Supply. |
| 5 | M/s TORRENT POWER LIMITED | Torrent Power Water lin 10.500 Km / Gas pipe line project Dahej 13.500 km 18’’ PCP Service | 24.07.2018 - 30.06.2019 | TLP 04,KRIK CELL 02 nos, Zinc 20kg 04 nos ,Pinbrezing 10 Nos,25 sq mm cable 100mtr,04 sq. mm cable 100mtr with HDPE pipe 50 Mtr. Service |
| 6 | M/s GITL (GSPL Group ) KALPATARU POWER TRANSMISSION LIMITED | Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL | 23.07.2018 - 30.12.2019 | 1060 Nos Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For 305 KM Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL |
| 7 | M/s GITL (GSPL Group) C/O- M/s KALPATARU POWER TRANSMISSION LIMITED | Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer -In -Charge For Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL | 23.07.2018 - 30.12.2019 | 265 No's Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer -In - Charge For 305 KM Mallavaram -Bhopal- Bhilwara- Vijapur Pipeline Project For M/s GITL |
| 8 | M/s. CAIRN ENERGY LIMITED C/O.M/s SOPAN O&M COMPANY PVT.LTD | Work order for PIN BRAZING JOB at Cairn - Badmer site | 06.11.2017-05.12.2017 | 20 Nos PIN BRAZING SUPPLY & INSTALLASTION |
| 9 | M/s GAIL (INDIA ) LIMITED C/O -M/s KALPATARU POWER TRANSMISSION LIMITED | Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For 157 KM Auraiya-Phulpur Project for M/s GAIL | 02.09.2017 - 15.08.2018 | 120 no’s Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer- In -Charge For Auraiya-Phulpur Project for M/s GAIL |
| 10 | M/s HINDUSTAN PETROLEUM CORPORATION LIMITED | SUPPLY & INSTALLASTION JETTY PIPELINE 24” 11.500 KM MUNDRA PORT TO - ADANI PORT 3 No's Pipeline | 06.06.2017 - 30.06.2017 | TLP 04 NOS, Zinc 20kg 04 NOS, Pinbrezing 16 NOS ,25 sq. mm cable 200 mtr,04 sq. mm cable 200 mtr, Permanent Ref. Cell 04 No’s ,Surge Drivetor 02 No’s SUPPLY & INSTALLASTION |
| 11 | M/s GAIL (INDIA ) LIMITED C/O. M/s KALPATARU POWER TRANSMISSION LIMITED | Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For 157 KM Auraiya-Phulpur Project for M/s GAIL | 05.06.2017 - 30.08.2017 | 120 no's Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In - Charge For Auraiya-Phulpur Project for M/s GAIL |
| 12 | M/s Indian Oil Corporation Limited.C/O – M/s Essar Project (INDIA)Limited | KV -Replacement Pipeline Project ( Koyali Refinryiping ) | 11.01.2017 - 30.06.2017 | KVPL Koyali plant piping 18"dia mainline laying work 0.500 km APPROX (COMPOSITE 2 MAINLINE) |
| 13 | M/s Indian Oil Corporation Limited. C/O – M/s Essar Project (INDIA)Limited | Purchase order for Supply of C.P. Mold 6 SQ MM & 25 SQ MM Used for Auraya - Phulpur Pipeline project of M/s GAIL | 05.06.2017 - 30.07.2017 | Supply of C.P. Mold 6 SQ MM & 25 SQ MM Used for Auraya - ur Pipeline project of M/s GAIL |
| 14 | M/s TORRENT POWER LIMITED | Torrent Power Gas pipeline Project Dahej 13.500 km 18’’ Installation & commissioning ER Probe | 25.12.2016 - 30.03.2017 | Installation & commissioning ER Probe |
| 15 | M/s TORRENT POWER LIMITED | Torrent Power Gas pipeline Project Dahej 13.500 km 18’’ PCP Material service | 10.08.2016 - 30.01.2017 | TLP 03,KRIK CELL 03,Zinc 20kg 03,pinbrezing 12,25 sq mm cable 200mtr,04 sq mm cable 200mtr with HDPE pipe 50 mtr Service |
| 16 | M/s TORRENT POWER LIMITED | Torrent Power Gas pipeline Project Dahej 13.500 km 18’’ PCP Material supply | 10.08.2016 to 30.01.2017 | TLP 03,KRIK CELL 03,Zinc 20kg 03,pinbrezing 12,25 sq mm cable 200mtr,04 sq mm cable 200mtr with HDPE pipe 50 mtr Supply |